Highways, Roads & Bridges

Traffic Engineering Devices at Various Locations, Phase 1

Various Locations, Honolulu, Hawaii

CLIENT

Department of Transportation Services City and County of Honolulu, Engineering Division

About the Project

A comprehensive program, implementing traffic control devices within Honolulu to improve pedestrian and vehicular traffic safety, was preparation of two Complete Streets demonstration projects. Each incorporated narrow lane striping, reverse parking, sidewalk bulb-outs at crosswalks, rectangular rapid flashing beacons and shared lane markings.

SSFM was responsible for preparing construction contract documents for sidewalks, crosswalks, traffic circles, roundabouts, solar powered speed radar signs, flashing beacons, speed humps, speed tables and skid resistance surfacing.

The 5 stage project included:

Stage 1 – Schematic design for concepts and schematic plans;

Stage 2 – Preliminary design of sketches, drawings, outline specifications, and preparing cost estimates.

Stage 3 – Final design to prepare construction contract documents and cost estimates based on the approved preliminary drawings.

Stage 4 – Services during the bid process.

Stage 5 – Advisory and consulting services during construction.


Contact Us:
501 Sumner Street Suite 620 Honolulu Hawaii 96817
808.531.1308
mmatsumoto@ssfm.com
©2026 SSFM International, Inc.
All rights reserved.
Island Experts
Over six decades of experience in the Pacific Region means we know the people, the places, the customs and the challenges of bringing projects to life throughout this region.
Contact Us:
501 Sumner Street Suite 620 Honolulu Hawaii 96817
808.531.1308
mmatsumoto@ssfm.com
©2026 SSFM International, Inc.
All rights reserved.
Contact Us:
501 Sumner Street Suite 620 Honolulu Hawaii 96817
808.531.1308
mmatsumoto@ssfm.com
©2026 SSFM International, Inc.
All rights reserved.