Water / Wastewater

Ocean Outfall at the Fort Kamehameha Wastewater Treatment Plant

Pearl Harbor, Hawaii

CLIENT

Department of the Navy, Pacific Division, Naval Facilities Engineering Command

About the Project

SSFM served as prime consultant responsible for project management, engineering and trenchless pipeline design for a 2.4 mile long sewer outfall for the Navy’s Pearl Harbor Public Work Center, Fort Kamehameha Wastewater Treatment Plant. The pipeline includes a 656 foot long multiport diffuser at a depth of 150 feet

The location is an environmentally sensitive shoreline area and required an Environmental Impact Statement, developed in accordance with the National Environmental Protection Act.

We conducted 11 separate studies and investigations including feasibility for alternative effluent disposal methods; geotechnical evaluation; birds in the area, ocean activities; dredging turbidity; effluent plume modeling; water quality and marine community structure; biotic and biological assessments; and far field water quality studies.

Contact Us:
501 Sumner Street Suite 620 Honolulu Hawaii 96817
808.531.1308
mmatsumoto@ssfm.com
©2026 SSFM International, Inc.
All rights reserved.
Island Experts
Over six decades of experience in the Pacific Region means we know the people, the places, the customs and the challenges of bringing projects to life throughout this region.
Contact Us:
501 Sumner Street Suite 620 Honolulu Hawaii 96817
808.531.1308
mmatsumoto@ssfm.com
©2026 SSFM International, Inc.
All rights reserved.
Contact Us:
501 Sumner Street Suite 620 Honolulu Hawaii 96817
808.531.1308
mmatsumoto@ssfm.com
©2026 SSFM International, Inc.
All rights reserved.