Project Management

Dry Dock No 1 Void Repair Phase 1

Joint Base Pearl Harbor-Hickam, Hawaii

CLIENT

NAVFAC Hawaii

About the Project

SSFM, as part of the SSFM NOEI JV, provided project management along with civil and structural engineering services for the full Design-Bid-Build package to support repair and maintenance of Dry Dock No. 1 Void Repair, Phase 1 at Joint Base Pearl Harbor-Hickam. Scope of work included a Site Engineering Investigation Report, DD 1391 re-validation, topographic and utility surveying, pavement and geotechnical investigations, hazardous materials testing, and preparation of construction plans for both the base bid and bid options.

Contact Us:
501 Sumner Street Suite 620 Honolulu Hawaii 96817
808.531.1308
mmatsumoto@ssfm.com
©2026 SSFM International, Inc.
All rights reserved.
Island Experts
Over six decades of experience in the Pacific Region means we know the people, the places, the customs and the challenges of bringing projects to life throughout this region.
Contact Us:
501 Sumner Street Suite 620 Honolulu Hawaii 96817
808.531.1308
mmatsumoto@ssfm.com
©2026 SSFM International, Inc.
All rights reserved.
Contact Us:
501 Sumner Street Suite 620 Honolulu Hawaii 96817
808.531.1308
mmatsumoto@ssfm.com
©2026 SSFM International, Inc.
All rights reserved.